
WEBS-MT/R Tower Installation Instructions
Copyright 2014 Talk-A-Phone Co. All rights reserved. Page 2 of 9
Talk-A-Phone Co. • 7530 North Natchez Avenue • Niles, Illinois 60714-3804
Phone 773.539.1100 • Fax 773.539.1241 • info@talkaphone.com • www.talkaphone.com
All prices and specifications are subject to change without notice.
Talk-A-Phone, Talk-A-Lert, Scream Alert and WEBS are registered trademarks of Talk-A-Phone Co.
WEBS-BACKUP (optional)
Mounting shelf for battery
III. Physical Installation
1. Install one 3/4” nut and one washer on each anchor bolt 2.5”-3.5" above grade to top of washer. This
will allow for a 1/2" air gap between the foundation and the tower which will allow airflow and prevent
moisture problems. Verify that the nuts are level (0° pitch).
NOTE: To insure proper grounding of all electrical components, the tower mount should be effectively earth grounded
from the grounding stud (located across from the lower access panel) with 6 AWG or better insulated, stranded copper
wire to the metallic power service raceway (conduit) or an 8' or longer corrosion-resistant ground spike.
2. After removing the lower access panel of the tower, install the tower onto the bolts with the
Emergency Phone opening oriented in the desired direction. Install second set of nuts and washers.
Tighten the upper nuts; the bottom set is only for leveling.
Comentarios a estos manuales